rim47cz8mch8q7dfwc2z.1920x0

Installation of four reactors at BP in Geel

A 600 ton-class tracked crane

Aertssen Kranen installed four heavy reactors of 110 tons on the BP site in Geel (Belgium).

Cranes
Geel
2014

Aertssen Kranen recently installed four heavy reactors of 110 tons on the BP site in Geel (Belgium). A 600 ton-class tracked crane was put on this job. Its 42-meter tall mast and 42-meter long topping lift boom made for quite an imposing sight alongside the E313 motorway.