Outdated browser. For a better experience, keep your browser up to date.

Aertssen Kanaaldok 1
31/01/2022

Dredging works B2, Antwerp

At the Antwerp Canal Dock B2, Aertssen was responsible for the dredging works to clear the new quay wall over a length of 800 metres. In total, 1.4 million cubic metres of dredging spoil is processed. At the same time, we are breaking down the old quay wall step by step.